Kitchen & Bath · 13
A bathroom built around daily ritual.
Stone, tile, and fixtures chosen for the long arc — and waterproofing that actually holds up.
Bathroom remodeling in Los Angeles
The small room that shapes the start and end of each day.
A bathroom remodel is part architecture, part waterproofing, part jewelry. Sage n' Slate rebuilds bathrooms across Los Angeles with the layout, stone, tile, and lighting decisions that turn the smallest room into the one you look forward to.
Design, engineering, and craft happen in one studio, so what's drawn is what gets built.
Week typical remodel
Tile, curated in studio
Team, demo to trim
Why homeowners choose us
What in-house craft brings to a bathroom.
Bathrooms are unforgiving — water finds every shortcut. Doing the boring parts well is what makes the room last.
Waterproofing done properly
not the cheap, fast way
Tile, stone, and fixture curation in-house
Layouts that respect plumbing realities and your morning routine
Lighting planned with the mirror, not the ceiling
Senior finishers
clean grout, tight reveals, level surfaces
Our process
How a bathroom moves through the studio.
Considered phases, scaled to the room.
Discovery
what's working, what isn't, who uses the room
Layout exploration
fixture placement, storage, and circulation
Design development
stone, tile, fixtures, and lighting
Engineering
structural and MEP review where needed
Permits
plumbing, electrical, and any structural work
Demolition and rough-in
Waterproofing, tile, stone, and finish work
Trim, lighting, and walk-through
What we remodel
The bathrooms we take on.
From powder rooms to primary suites.
- 01Primary baths and spa-style suites
- 02Guest baths and shared family baths
- 03Powder rooms
- 04Curbless walk-in showers and wet rooms
- 05Tub-to-shower conversions
- 06Vanity and millwork renovations
Service area
Sherman Oaks and greater Los Angeles.
Sage n' Slate is based in Sherman Oaks and remodels bathrooms throughout Los Angeles and the surrounding areas.
Service Area
34.05° N / 118.24° WLos Angeles & surrounding neighborhoods.
Common questions
Asked and answered.
How long does a bathroom remodel take?
+
Most bathrooms run 8–14 weeks of construction, with a design phase of 4–8 weeks beforehand.
Can we live in the home during the remodel?
+
Yes, as long as there's another bathroom available. We'll plan dust protection and access carefully.
Do you handle tile and stone selection?
+
Yes. Curation is part of the work — we'll guide tile, stone, fittings, and lighting to the room and the rest of the home.
Do bathroom remodels require permits?
+
Most do, especially anything involving plumbing or electrical changes. We handle the permits and inspections.
Start a project
Let's talk about your bathroom.
Tell us a little about the home and the scope. We'll come back within two business days.